New Berms on the Red Trail
Saturday, June 27th, 2015
It was a productive day for the combined efforts of the FCNEMBA trail crew and the local freeriders (a.k.a. the Pequonnock Valley Trail Care team).
Two berms were built on the red trail and the jump further up the trail was built out and the rough rooty trail below it was smoothed out. 25 to 30 folks showed up to help and the weather was cool and cooperative!
starting the new berm
lower berm prep
moving monster rocks
progress on the new (main) berm
progress on beefing up the lower berm
Mick the beer man rode in with a cooler full of beer!
ah… tasty!
James testing out the new berms at Trumbull
photos sourced from a blog